MIL-DTL-13718F
TABLE II. Order of conformance testing.
Title
Requirement
Test
Pickup voltage (77 + 15°F only)
3.4.4
4.5.6
(25 + 8.3°C)
Dropout voltage (77 + 15°F only)
3.4.5
4.5.7
(25 + 8.3°C)
Contact voltage drop
3.4.6
4.5.8
4.5 Method of inspection.
4.5.1 Materials. Conformance to 3.2 thru 3.2.3.2, and 3.3.5.1 shall be determined by
inspection of contractor records providing proof of certification that the materials conform to the
requirements. Applicable records shall include drawings, specifications, design data, receiving
inspection records processing and quality control standards, vendor catalogs and certifications,
industry standards, test reports and rating data.
4.5.2 Classification of defects. Conformance to 3.3 through 3.3.6, 3.3.8, 3.5, 3.6, and 3.7
shall be determined by examination for the defects listed in table III. Examination shall be visual,
tactile, or by measurement with SIE.
TABLE III. Classification of defects.
Method of
Category
Defect
examination
Major:
101
Dimensions affecting interchangeability, not within
tolerance (see 3.3)
SIE 1/
102
Inadequate locking devices (see 3.3.1).
Visual
103
Terminals and connectors not as specified (see 3.3.2).
Visual and SIE
104
Mounting not as specified (see 3.3.3).
Visual
105
Polarity reversed (see 3.3.4).
SIE
106
Mechanical failure (see 3.3.5).
Visual
107
Springs (see 3.3.5.1).
SIE
108
Weight not as specified (see 3.3.6).
109
Paint on grounding surfaces (see 3.5).
Visual
Minor:
201
Dimensions not affecting interchangeability, not within
SIE
tolerance (see 3.3).
202
Improper finish (see 3.5).
Visual
203
Improper marking (see 3.6).
Visual
204
Workmanship not as specified (see 3.7).
Visual
1/ SIE = Standard Inspection Equipment.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business