MIL-PRF-62122E
TABLE II b. Order of first article test for receptacles - Continued.
Subsequent test
Title
Requirement
Procedure
Requirement
Procedure
Resistance to petroleum
3.4.2.3
4.7.4.3
--
--
products
Current, continuous
--
--
3.4.1.2
4.7.3.2
Current, overload
--
--
3.4.1.3
4.7.3.3
Dielectric withstanding
--
--
3.4.1.4
4.7.3.4
voltage
Contact resistance
--
--
3.4.1.5
4.7.3.5
Mating
--
--
3.4.2.4
4.7.4.4
TABLE II c. Order of first article test for adapters.
Subsequent test
Title
Requirement
Procedure
Requirement
Procedure
Specimens 1 and 2
Materials and construction
3.2 and 3.3
4.7.1
--
--
Defects (see 4.7.2 and
3.3, 3.5 and
4.7.2
--
--
table IV)
3.6
Current, continuous
3.4.1.2
4.7.3.2
--
--
Current, overload
3.4.1.3
4.7.3.3
--
--
Corrosion resistance
3.4.2.2
4.7.4.2
--
--
Contact resistance
--
--
3.4.1.5
4.7.3.5
Dielectric withstanding
3.4.1.4
4.7.3.4
--
--
voltage
Specimens 3 and 4
Mating
3.4.2.4
4.7.4.4
--
--
Continuity
3.4.1.1
4.7.3.1
--
--
Current, continuous
3.4.1.2
4.7.3.2
--
--
Current, overload
3.4.1.3
4.7.3.3
--
--
Resistance to petroleum
3.4.2.3
4.7.4.3
--
--
products
Current, continuous
--
--
3.4.1.2
4.7.3.2
Current, overload
--
--
3.4.1.3
4.7.3.3
Dielectric withstanding
--
--
3.4.1.4
4.7.3.4
voltage
Contact resistance
--
--
3.4.1.5
4.7.3.5
Mating
--
--
3.4.2.4
4.7.4.4
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business