MIL-DTL62062E
4.2 First article inspection. Unless otherwise specified (see 6.2), first article inspection
shall be performed on preproduction or initial production samples as specified herein.
4.2.1 Preproduction inspection. When specified (see 6.2), the preproduction sample
shall consist of four blowers. Preproduction inspection shall consists of the inspections specified
in table I and in the order specified in table II.
Table I. Verification methods.
First article
Conformance
Title
Requirement
Verification
Sample unit
Examination Acceptance
1234
test
3.2 through
Materials, design, and
3.2.4
4.4.3
X X
X X
construction
3.3
4.4.4
Operating requirements
Endurance
3.3.1
4.4.4.1
X
X
Airflow
3.3.2
4.4.4.2
X
X
Dielectric strength
3.3.3
4.4.4.3
X
XX
X
3.4
4.4.5
Interface requirements
Electromagnetic
compatibility
3.4.1
4.4.5.1
X
X
Painting
3.4.2
4.4.5.2
X X
X X
Interchangeability
3.4.3
4.4.5.3
X X
X X
Support and ownership
3.5
4.4.6
requirements
Identification marking
3.5.1
4.4.6.1
X X
X X
Safety
3.5.2
4.4.6.2
X X
X X
Operating environment
3.6
4.4.7
requirements
3.6.1
4.4.7.1
X
X X
X
High temperature
Low temperature
3.6.2
4.4.7.2
X
X
X
Vibration
3.6.3
4.4.7.3
X
X
X
Shock
3.6.4
4.4.7.4
X
X
X
Sand & dust
3.6.5
4.4.7.5
X
X
Corrosion resistance
3.6.6
4.4.7.6
X
3.6.7
4.4.7.7
X
X
Fungus resistance
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business