Table II. Order of preproduction.
Sample
Verification
Title
1
4.4.4.3
Dielectric strength
4.4.7.1
High temperature
4.4.7.2
Low temperature
4.4.7.3
Vibration
4.4.7.4
Shock
4.4.4.1
Endurance
4.4.4.2
Airflow
2
4.4.5.1
Electromagnetic
compatibility
3
4.4.4.3
Dielectric strength
4.4.7.1
High temperature
4.4.7.7
Fungus resistance
4
4.4.4.3
Dielectric strength
4.4.7.2
Low temperature
4.4.7.3
Vibration
4.4.7.6
Corrosion resistance
4.4.7.4
Shock
4.4.7.5
Sand & dust
4.2.2 Initial production inspection. Unless otherwise specified (see 6.2), the Government
shall select four blowers produced under the production contract for initial production inspection.
Initial production inspection shall consist of the inspections specified in table I and in the order
specified in table III.
Table III. Order of initial production.
Verification
Title
4.4.4.3
Dielectric strength
4.4.7.1
High temperature
4.4.7.2
Low temperature
4.4.7.3
Vibration
4.4.7.4
Shock
4.4.4.1
Endurance
4.4.4.2
Airflow
4.3 Conformance inspection. Conformance inspection shall include the examinations of
4.3.2 and the tests of 4.3.3.
4.3.1 Sampling. Sampling shall be as specified in the contract or order(see 6.2).
4.3.2 Examination. Each blower selected in accordance with 4.3.1 shall be subjected to
the examinations specified in table I. Failure of any examination shall be cause for rejection.
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business