MIL-PRF-62061D
2.3 Non-Government publications. The following documents form a part of this
document to the extent specified herein. Unless otherwise specified, the issues of these
documents are those cited in the solicitation or contract.
ASTM INTERNATIONAL
ASTM B117
-
Standard Practice for Operating Salt Spray (Fog) Apparatus
(DoD Adopted)
ASTM G21
-
Standard Practice for Determining Resistance of Synthetic
Polymeric Materials to Fungi (DoD Adopted)
(Copies of these documents are available from www.astm.org or ASTM International, 100 Barr
Harbor Drive, West Conshohocken, PA 19428-2959.)
2.4 Order of precedence. Unless otherwise noted herein or in the contract, in the event
of a conflict between the text of this document and the references cited herein, the text of this
document takes precedence. Nothing in this document, however, supersedes applicable laws and
regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 First article. When specified (see 6.2), a sample shall be subjected to first article
inspection in accordance with 4.1.1.
3.2 Design, materials, and manufacturing processes. Unless otherwise specified, the
design, materials, and manufacturing process selection shall be the prerogative of the contractor
as long as all articles submitted to the government fully meet the operating, interface, ownership
and support, and operating environment requirements specified.
3.2.1 Recycled, recovered, or environmentally preferable materials. Recycled,
recovered, or environmentally preferable materials should be used to the maximum extent
possible, provided that the material meets or exceeds the operational and maintenance
requirements, and promotes economically advantageous life cycle costs.
3.3 Operating requirements.
3.3.1 Polarity. The generator shall be designed to operate within a negatively grounded
electrical circuit (see 4.5.1).
3.3.2 Output. The generator shall meet the performance requirements specified in
figure 1 (see 4.5.2).
3.3.2.1 Output, performance checkpoint (heat stabilized). The generator shall
subsequently meet the requirements at the one stabilized performance checkpoint indicated in
figure 1 (see 4.5.2.1).