MIL-PRF-46795H
TABLE I. Order of first article testing - Continued.
Sample
number
Requirement
Test
Requirement
3
3.4.3
4.9.1
Rated output
3.4.2.2
4.8.2
Voltage regulation
3.4.5
4.11
Overspeed
3.4.3
4.9.1
Rated output
3.4.9
4.15
Vibration
4/
4/
3.4.2.2
4.8.2
Voltage regulation
3.4.3
4.9.1
Rated output
3.4.2.2
4.8.2
Voltage regulation
3.4.13
4.19
Sand and dust
3.4.3
4.9.1
Rated output
3.4.2.2
4.8.2
Voltage regulation
4
3.4.3
4.9.1
Rated output
3.4.2.2
4.8.2
Voltage regulation
3.4.10
4.16
Submersion
5/
3.4.3
4.9.1
Rated output
5/
3.4.2.2
4.8.2
Voltage regulation
5
3.4.3
4.9.1
Rated output
3.4.2.2
4.8.2
Voltage regulation
3.4.2.3
4.8.3.2
Load switching
3.4.3
4.9.1
Rated output
3.4.2.3
4.8.3.1
High voltage transients
3.4.3
4.9.1
Rated output
6
3.4.12
4.18
Corrosion resistance (200 hours)
6/
3.4.3
4.9.1
Rated output
3.4.2.2
4.8.2
Voltage regulation
6/
7
3.4.11
4.17
Fungus resistance (90 days)
7/
3.4.3
4.9.1
Rated output
3.4.2.2
4.8.2
Voltage regulation
7/
1/, 2/, 3/, 4/, 5/, 6/, and 7/ Samples shall undergo simultaneously
those tests marked with same footnote number.
4.3.1 Generating system. Seven generating systems (see 3.1) shall be identified for first
article inspection and shall undergo the examinations and tests as specified in 4.3.
4.3.2 Repair parts. Seven samples of an individual part shall be substituted in generating
systems previously approved as having undergone first article inspection (see 4.3).
Subsequently, generating systems shall undergo examinations and tests specified in 4.3.
4.4 Conformance inspection. Conformance inspection shall include the examinations of
4.4.2 and the tests of 4.4.3.