MIL-DTL-62576B
TABLE II. Sequence of first article inspection.
Sample
Test
Paragraph
1
23
4
Reverse current
4.5.1
X
XX
X
Voltage regulation
4.5.4
X
XX
X
Voltage ripple
4.5.5
X
XX
Current regulation
4.5.6
X
XX
Field excitation
4.5.8
X
XX
High temperature
4.8.1
XX
Low temperature
4.8.2
XX
Endurance
4.7.1
X
Vibration
4.8.3
X
X
Shock
4.8.4
X
X
Waterproofness
4.8.7
X
X
X
Corrosion resistance
4.8.5
X
Transient voltage
4.5.2
X
X
Overvoltage
4.5.7
X
X
X
Fungus resistance
4.8.6
X
Electromagnetic interference
4.5.15
X
Field circuit
4.5.11
X
X
X
Negative voltage operation
4.5.10
X
X
Short circuit protection
4.5.13
X
X
X
Generator accessory sensing circuit
4.5.14
X
X
X
4.4 Verification methods. Acceptable verification methods included in this section are
visual inspection and measurement, sample tests, full-scale demonstration tests, simulation,
modeling, engineering evaluation, component properties analysis, and similarity to
previously-approved or previously-qualified designs.
4.4.1 Verification alternatives. The manufacturer may propose alternative test methods,
techniques, or equipment, including the application of statistical process control, tool control, or
cost effective sampling procedures to verify performance. See the contract for alternatives that
replace verification methods required by this specification.